Orbital Insertion Burn - Webb Arrives at L2
-
- Engineering:
- Pat Kennedy
-
- Produced by:
- Michael McClare
-
- Videography:
- Michael McClare
-
- Technical support:
- Aaron E. Lepsch
- View full credits
On January 24, 2022 at 2 p.m. EST, Webb fired its onboard thrusters for nearly five minutes (297 seconds) to complete the final postlaunch course correction to Webb’s trajectory. This mid-course correction burn inserted Webb toward its final orbit around the second Sun-Earth Lagrange point, or L2, nearly 1 million miles away from the Earth.
Mission Operations Control loop audio during Mid-Course Correction Burn #2 on January 24, 2022. Note: Long pauses of silence were edited out to shorten the audio clip. All spoken audio was retained. Corresponding video was captured by 2 ceiling mounted cameras in the MOC at the Space Telescope Science Institute in Baltimore, Maryland.
Credits
Please give credit for this item to:
NASA's Goddard Space Flight Center
-
Scientist
- John Mather (NASA/GSFC)
-
Engineer
- Pat Kennedy (KBR Wyle Services, LLC) [Lead]
-
Producer
- Michael McClare (KBR Wyle Services, LLC) [Lead]
-
Videographer
- Michael McClare (KBR Wyle Services, LLC) [Lead]
-
Technical support
- Aaron E. Lepsch (ADNET Systems, Inc.) [Lead]